Hybrid Battery Max

Take maximum advantage of higher network capacity limits

Key Documents

Download the Hybrid Battery Max data sheet

Download the Redback Installer Brochure

View the Battery Warranty for this unit

All-in-one solution to take advantage of higher connection limits for an increased ROI

With an up to 9.9kVA inverter, homeowners are given the opportunity to maximise their return on investment by utilising higher connection limits and exporting more power to the grid. Available with 10kWh – 25kWh of battery storage.

The Hybrid Battery Max comes with pre-wired switchgear, optimised AC and DC connections, remote meter check and CT flip for easier install, a streamlined app experience, and over-the-air updates leading to fewer site visits. Wi-Fi and 4G connectivity are included with the Hybrid Battery Max, as well as a market-leading VPP functionality.

RED-H3-S05HV, RED-H3-S06HV, RED-H3-S08HV & RED-H3-S10HV

Icon of cloud and power button

Market-leading VPP functionality

Connectivity icon

4G and WiFi connectivity included
(Compatible with the latest WiFi routers)

Easy commissioning with the RedbackInstall app

Red Icon Showing 10 Years in a Shield

10-year Australian-backed warranty

Indoor and outdoor installation

Australia icon

Engineered for Australian homes

Meet Smart Load Control

Smart Load Control allows homeowners to make the most of their self-generated energy by operating a single large load (such as a pool pump or hot water system) when there is excess solar energy available.

Smart Load Control is a sophisticated system that aims to:

  • Run the load using only excess PV energy.
  • Avoid switching the load excessively (e.g., when a small cloud passes in front of the sun).
  • Optionally, the system will ensure that the load runs for a nominated number of hours each day. This is useful for equipment like pool pumps or hot water systems which require a minimum daily runtime.

The Smart Load Control feature is available across the entire Redback range. For more information, please refer to the Installation Guide found in the Redback Portal.

Site Manager for the Hybrid Battery Max

Site Manager allows you to install multiple Redback battery storage systems at a single site (behind the same meter) and have them operate in tandem, in order to get the best results from your batteries. When configured correctly, the charging and discharging of the batteries is balanced across all systems on the site to ensure the equal utilisation of every system. Site Manager requires that one of the systems is nominated as the “Master”. The Master controls the other systems on the site, referred to as “Workers”.

Site Manager makes use of the site’s local area network (LAN) for communications between systems. This means that it is often possible to enable Site Manager on sites that already have systems installed. The settings can be applied remotely via Redback’s portal: in most cases, a site visit will not be required. For more information, please refer to the Installation Guide found in the Redback Portal.