Hybrid Battery
3-phase
Robust Hybrid Battery System for 3-phase properties with up to 50kWh* of battery storage.
The all-in-one solar inverter and battery storage solution for 3-phase properties
Redback’s Hybrid Battery 3-phase is the all-in-one hybrid system for 3-phase homes, rural properties and small commercial applications. The system combines a 10kVA – 29.9kVA solar inverter with 15kWh – 25kWh of battery storage, and an option for an extended capacity of 50kWh.
Site Manager allows installation of multiple systems at a single site to operate as a single system. The Hybrid Battery 3-Phase has pre-wired switchgear, optimised AC and DC connections, remote meter check and CT flip, streamlined app experience, and over-the-air updates leading to fewer site visits.
*50kWh expandable.
RED-H3-S05HV, RED-H3-S06HV, RED-H3-S08HV & RED-H3-S10HV
Market-leading VPP functionality
4G and WiFi connectivity included
(Compatible with the latest WiFi routers)
Easy commissioning with the RedbackInstall app
10-year Australian-backed warranty
Indoor and outdoor installation
Engineered for Australian homes
Meet Smart Load Control
Smart Load Control allows homeowners to make the most of their self-generated energy by operating a single large load (such as a pool pump or hot water system) when there is excess solar energy available.
Smart Load Control is a sophisticated system that aims to:
- Run the load using only excess PV energy.
- Avoid switching the load excessively (e.g., when a small cloud passes in front of the sun).
- Optionally, the system will ensure that the load runs for a nominated number of hours each day. This is useful for equipment like pool pumps or hot water systems which require a minimum daily runtime.
The Smart Load Control feature is available across the entire Redback range. For more information, please refer to the Installation Guide found in the Redback Portal.
Site Manager for the Hybrid Battery 3-Phase
Site Manager allows you to install multiple Redback battery storage systems at a single site (behind the same meter) and have them operate in tandem, in order to get the best results from your batteries. When configured correctly, the charging and discharging of the batteries is balanced across all systems on the site to ensure the equal utilisation of every system. Site Manager requires that one of the systems is nominated as the “Master”. The Master controls the other systems on the site, referred to as “Workers”.
Site Manager makes use of the site’s local area network (LAN) for communications between systems. This means that it is often possible to enable Site Manager on sites that already have systems installed. The settings can be applied remotely via Redback’s portal: in most cases, a site visit will not be required. For more information, please refer to the Installation Guide found in the Redback Portal.